Power cables
Power cables are divided into low-voltage cables,medium-voltage cables,high-voltage cables,etc.It can be divided into plastic insulated cable,rubber insulated cable, mineral insulated cable, etc.
Control cable
The control cable is similar to the power cable in that it has only copper core and no aluminum core. The conductor section is small and the number of cores is large, such as 24*1.5, 30*2.5 flat cables,Copper core cable,Armored cable,high voltage power cable,3 core Cables Henan New Electric Power Co.,Ltd. , https://www.newelectricpower.com
1. Bidding Document No.: FTCG2009015231
2. Name of the bidding project: Intelligent system equipment and installation procurement of the surgical inpatient building of Futian District People's Hospital
3. Subject content: see user demand book
4. How to obtain the tender:
All registered Shenzhen online government procurement suppliers can log in to Shenzhen Futian District Government Procurement Website from May 15, 2009 to June 2, 2009 at 9:30 am in accordance with the granted operating authority. Ft.szzfcg.cn/ to respond to bid registration and download the bidding documents for this project. If the bidder decides to participate in the bidding, he/she must first apply for bidding online in the Futian District Government of Shenzhen. The method is to log in to the Futian District Government Procurement Network in Shenzhen and click “Shengbiao Management→Bid Response†or “Acceptable Management→Confirm Invitationâ€; If you do not participate in the bidding after registering online, you should click “Reject†or “Cancelâ€. If you are not registered as a supplier of online government procurement in Shenzhen, please visit the Shenzhen Government Procurement Website, first apply for registration, and then apply for bidding. After registering online, click “Should be managed → download bidding documents†to download the bidding documents.
5. Bidder qualification requirements:
1) Bidders must be registered in the territory of the People's Republic of China and have independent legal personality.
2) Must be a government procurement supplier registered with the Shenzhen Municipal Government Procurement Center.
3) The registered capital of the bidder is more than RMB 55 million (including RMB 55 million);
4) Qualification level of design, construction and maintenance qualification certificate for safety technical protection system at the provincial or municipal level;
5) Have a special design certificate for building intelligence issued by the Ministry of Construction (Level B or above);
6) Have the second-class or above qualification for construction intelligent specialization issued by the Ministry of Construction (including Level 2);
7) Having the qualification of computer information system integration issued by the Ministry of Information Industry;
8) Since January 2003 (subject to the time of signing the contract), the amount of a single contract of a similar weak electricity project is more than 30 million yuan (including 30 million yuan), not less than one (providing a notice of winning bid or contract);
9) Major equipment manufacturers (BA equipment, integrated wiring system equipment, servers, computer network equipment and desktop management software, program-controlled switches, monitoring system equipment, card system equipment, information distribution system, touch inquiry system, medical display) are required for bidding. System, LED display system, office PC equipment, UPS, leakage fire alarm system) The original bidding authorization document issued by the bidder and the original after-sales service commitment letter (with the official seal of the manufacturer). The original of the tender is the original of the project bid authorization and the original after-sales service commitment letter.
10) The technical description and technical parameters with “★†in the technical requirements require each manufacturer to issue a technical response letter of commitment (with the official seal of the manufacturer and indicate the contact person and telephone for inspection).
11) With the "★" number, the product certification report, patent certificate and other quality certification documents required by the bidder must be stamped with the original official seal, and the waste standard of the original official seal is not provided or not required to be stipulated. Other materials that do not carry the "★" number and do not affix the original official seal as required shall be deemed invalid.
12) This project does not accept any bidders in the form of a consortium.
6. Q&A: If there is any doubt about the bidding documents before 18:00 on June 2, 2009 (including the tendency of the technical indicators or parameters of the bidding documents to be biased or unfair), please log in to the “Futian District Government of Shenzhenâ€. Purchasing Network", fill in the question in "Acceptable Management → Bid Q & A", and will not be accepted after the deadline. The bidding party will announce the results of the Q&A in the “Standard Management → Bid Q&A†or notify the bidders.
7. Time for submitting bid documents:
All bid documents should be submitted to the first floor of the Futian District Government Office Building (South Parking Lot) between 9:00 and 9:30 am on June 9, 2009 (overdue delivery or non-conforming tender documents) Futian District Government Procurement Center Bid Opening Room (next to the electronic evaluation room of Futian District Government Procurement Center).
8. Submission of bid samples (or prototypes): Each bidder must submit the bidding sample to the opening bidding room on the first floor of the procurement center on the day of the bid opening, that is, 9:00 am to 9:30 am on June 9, 2009 (Futian District Government Office) The south side of the parking lot on the first floor of the building, opposite the National Treasury Payment Management Center), the specific requirements for the bid sample (or prototype) can be found in the annex to the bidding documents.
9. Deadline for bid submission and opening time: 9:30 am on June 9, 2009.
10. Bid Opening Location: Futian District Government Office Building 1st Floor (South Side Parking Lot) Futian District Government Procurement Center Bid Opening Room (next to the electronic evaluation room of Futian District Government Procurement Center).
11. Please note that the contents of the clarification documents, amendments or supplementary notice documents related to the bidding documents will only be announced on the “Futian District Government Procurement Network†after the issuance of the bidding documents. The bidder is obliged to browse the Shenzhen Futian District Government Procurement Network from time to time during the bidding period. The information about the bidding project announced by the tenderee is deemed to have been delivered to the bidders. The tenderer will not call the bidders again.
12. For the matters related to this tender, you can inquire by written and telephone in the following contact forms:
Contact Unit: Shenzhen Futian District Government Procurement Center
1) Consultation methods related to the project before the bid opening:
Address: Room 2904, 29th Floor, Office Building, Futian District, Shenzhen (Purchasing 1)
2) Consultation methods for related matters after the project is opened:
Address: 1st Floor, Government Office Building, Futian District, Shenzhen, China (Review) Standard Room (Purchasing 2) Company Name: Futian District Government Procurement Center, Shenzhen Contact: Mr. Liu Tel: 0755-82917623 E-mail: Fax: 0755-82918954 Postal Code: Address:
Power cables are cable products used to transmit and distribute high-power electric energy in the trunk line of the power system,including power cables with various voltage grades and insulation of 1-330 KV and above.
It is applicable to single machine control or unit equipment control of power stations, substations, mines, petrochemical enterprises, etc. with AC rated voltage of 450/750V and below. In order to improve the ability of control signal cable to prevent internal and external interference, shielding layer is mainly adopted.
Empty insulated wire
We are also very common in overhead power lines. Its characteristic is that there is no protective sheath. Its electrical conductors are not only aluminum, but also copper electrical conductors (JKYJ, JKV) and aluminum alloy profiles (JKLHYJ). Now it also has overhead power lines (JKLGY). It is not only single-core. Generally, it is single-core. However, it can also generate beams from two electrical conductors. The rated voltage of overhead power lines is 35KV and below, not 1KV and 10KV.
People's Hospital intelligent system equipment (including LED display) and installation tender
Title: People's Hospital Intelligent System Equipment (including LED display) and installation tender Tender No.: FTCG2009015231 Announcement Date: May 18, 2009 Deadline: June 9, 2009 Tendering Agency: Shenzhen Futian District Construction Bureau Provinces and cities: Guangdong Province-Shenzhen Content: Shenzhen Futian District Government Procurement Center was commissioned by Shenzhen Futian District Construction Bureau to conduct public bidding for the intelligent system equipment and installation procurement project of Futian District People's Hospital Surgery Inpatient Building (second Sub-public bidding), qualified suppliers are welcome to participate in the bidding.