(Part 2 of the Bidding) Datang Henan Henan Huaxian Zaocun Wind Farm Project Survey Design Tender Notice

(Part 2 of the Bidding) Datang Henan Henan Huaxian Zaocun Wind Farm Project Survey Design Tender Notice

Pursuant to the “Law of the People’s Republic of China on Tendering and Bidding”, “Regulations on the Implementation of the Tender and Bidding Law of the People’s Republic of China” and relevant laws and regulations, the principles of openness, fairness, impartiality, and good faith are entrusted by Datang Henan Clean Energy Co., Ltd. The Tangshan Zaocun wind farm project survey and design of Datang Henan Province is open to the public, and the units that meet the qualification requirements are welcome to participate.

I. Project Description:

Project Name: Datang Hua County Zao Village Wind Farm Project Location: Huai County, Anyang City, Henan Province Current Capacity: 300MW Unit Type: Wind Turbine Project Entity: Datang Henan Clean Energy Co., Ltd. Design time requirements: Under the premise that the entrusting party provides the relevant basic information, complete the preliminary design, tender design and construction drawing phase of all survey design and service work according to the project company approved schedule. 1) After the contract is signed, the wind turbine bidding technical documents will be provided within 20 days according to the request of the entrusting party; 2) After the fan is calibrated, the Design Institute will complete the micro-site selection of the fan within 30 days; 3) Provide the road within 25 days after the microsite is selected Drawings and tendering technical documents for road construction bidding; 4) Wind turbine foundation and grounding, blower installation bidding quantity list and bidding technical documents, wind turbine construction and construction bidding within 25 days after providing basic data; providing tower tendering technology The documents will be used for the bid invitation of the tower; 5) After the contract is signed, the design of the booster station shall be provided within 20 days according to the request of the entrusting party, submitted to the project company for review, and submitted to the design institute within 25 days after the completion of the inspection. Technical documents for civil installation and construction of power collection lines and booster stations, fire protection construction, and settlement observation tender; provision of substation equipment inventory and bidding technical documents for box change, main transformer, high and low voltage switchgear, GIS and auxiliary equipment, 35kV Power compensation equipment bidding work; 6) After the booster station program design review is completed, within 40 days Design Institute to provide comprehensive automation and protection equipment, DC power supply, cables and accessories strokes mining equipment inventory and technical tender documents, tender work carried out in this area of ​​the device. The final progress requirements shall be implemented according to the agreement of both parties.

Second, the scope of the tender:

From the preliminary design to the whole process of unit production and survey bidding. Include the following but not limited to: Review of the fan selection results in the feasibility study report (if there are major deviations, re-engineer the wind turbine selection report), topographic map mapping (collection of review nuclear county map), wind farm Geological survey, review of wind resources, micro-site selection of wind turbines, survey and design of wind farm entry roads and maintenance roads, basic survey and design of wind turbines and wind turbine chassis, civil construction and installation design of booster stations, civil and installation design of 35 kV collector lines, and grounding grid Design and inspection of all civil works. The survey, preliminary design and budget estimation of the entire wind power project, construction drawing design, as-built drawing preparation, technical services (including design drawings and on-site design, etc.) and technical documentation for the related construction bidding, equipment, and material tendering (including participation Evaluation work and design liaison meeting, work to meet the tendering quantity list, engineering control piles measurement, cooperation with compliance work, labor safety and industrial hygiene, fire protection, safety facilities design, etc. Preparation work, etc. According to relevant regulations, requirements and requirements of Datang Corporation, the project will carry out the optimization design work of this project and cooperate with the completion of the creation of quality projects. Meet all relevant survey and design requirements for the current phase of the project.

Third, the bidder's qualification requirements:

Qualification level of the bidder: The bidder must have a Grade A and Grade A design qualification certificate for comprehensive survey, and have the stage survey and design performance of the wind farm project with a scale of 150 MW and above that has been put into production by two or more independent wind turbines within the last five years. Personnel, equipment, funds, etc., have corresponding survey and design capabilities. The proposed project manager must have a phased survey and design performance of wind power project construction drawings with a production scale of 150 MW or more and an independent commitment of 2 or more in the past 5 years. Passed ISO9001: 2000 quality management system certification, ISO14001: 2004 environmental management system certification, occupational health and safety management system certification or (OSHMS) occupational safety and health management system certification. Credit rating certificate or bank credit certificate.

The tender does not accept the consortium bid

Fourth, the tender documents obtained:

4.1 Ways to Obtain Bidding Documents: Log in, apply for the bidding document with the company's CA certificate electronic key and follow-up bids.

4.2 Bidding Documents Available: November 15 to November 25, 2016.

2) The result of the purchase is subject to the platform.

4.3 After the tender has adopted the post-qualification method, the bid evaluation committee will review the qualifications of the bidders after the bid opening. The bidders' bids that do not meet the requirements of the tender notice will be treated as rejected bids.

V. Submission of tender documents:

5.1 Deadline for submitting tender documents (Bid deadline, the same below): December 10, 2016, 10:00 am.

5.2 Delivery Location: Beijing.

5.3 Ways of submission: Prior to the deadline for submitting tender documents, potential bidders submitted paper tender documents and their electronic versions according to the requirements of the tender documents, and completed the electronic uploading and uploading of electronic tender documents on e-commerce platforms. Written documents submitted late or not delivered to designated locations or not sealed as required will not be accepted by the tenderee.

5.4 Other submission methods and issues requiring attention: The electronic version of the bidding documents needs to be submitted on the platform, and the electronic opening and evaluation of bids shall be implemented. At the opening of the bid, the tenderer’s written bid documents will not be opened or singed, and they will only be used for archiving purposes.

The opening of the bid is subject to the electronic bid opening method. For bidders who are not familiar with the online bidding operation, we will hold a training conference.

Contact: Qian Yong

Mobile:

phone

fax

E-mail:

In order to ensure that you can bid smoothly, please consult the bidding agency or the tenderer for detailed requirements for bidding before bidding or purchasing the bidding documents. The specific requirements and project conditions shall be interpreted by the bidding agency or the tenderee.

Air Handing System

Air Handing System,Air Handing Unit System,Air Ventilation System,Air Heating Cooling System

Chongqing LDJM Engine Parts Center , https://www.ckcummins.com