XGD(XQ)-2013-17 Land Property Development Project General Contracting Tender Notice

Tender Notice
(Applicable after review)
XDG(XQ)-2013-17 Land Property Development Project (Project Name) Construction Tender Bid Construction Tender Notice
1, tender conditions
This tender project XDG(XQ)-2013-17 plot real estate development project (project name) has been developed by Wuxi National High-Tech Industrial Development Zone (Xinwu District, Wuxi) Economic Development Bureau (name of project approval, approval or filing authority) In response to the approval of the construction of XDG (XQ)-2013-17 land block real estate development project by Wuxi Zhongguancun Software Park Development Co., Ltd., Xixin Jingfa [2017] No. 206 (name and number of approval document) was approved for construction. The project owner is Zhongguancun, Wuxi. Software Park Development Co., Ltd., the construction fund comes from self-raised (fund source), the proportion of project investment is 100.00% of state-owned funds, 0.00% of private funds, 0.00% of foreign government and organization investment, and 0.00% of overseas private investment, and the bidder is Zhongguancun Software Park in Wuxi. Development Co., Ltd., the bidding agency for Jiangsu Jinnuo Construction Consulting Management Co., Ltd. The project has already met the conditions for bidding. The project is now undergoing open bidding. This project is an online e-bidding.
2. Project overview and scope of tender
Construction Location: West of Jinghui West Road, Xinbei Road, Xinwu District, Wuxi, Wuxi
Project size: Building layer (maximum): 3 floors; bidding price of the tender: 180 million yuan; total construction area of ​​the bid: 5729.75 square meters; building height (maximum): 18.15 meters; single span (maximum) : 8 meters; single building area (maximum): 2532.34 square meters; number of building floors (maximum): 3 floors; bidding price of the tender section: 18 million yuan; total construction area of ​​the tender section: approximately 5,729.75 square meters; Height (maximum): 18.15 meters; single span (maximum): 8 meters; single building area (maximum) 2532.34 square meters
Plan duration: 336 calendar days.
Estimated contract price: 18 million yuan
Scope of the tender: Construction contracting for civil and hydropower installation within the scope of drawings
Bid section division: 1 bid section
Quality standard: 100% one-time acceptance
3, bidder qualification requirements
3.1 The tender requires bidders to meet the following requirements:
3.1.1 qualification conditions: [architectural engineering (2015 new standards) three] (inclusive) or more
3.1.2 Financial requirements: financial accounting statements for the period 2014 to 2016 (if the bidder's establishment time is insufficient for the required year, financial accounting statements since its establishment are provided)
3.1.3 Performance Requirements:/
3.1.4 Credibility requirements: The company is not in a position to be ordered to suspend business, the bid is cancelled or the property is taken over, frozen and bankruptcy; there is no concealment, falsehood, forgery, etc.; it has not been caused by its own breach of contract or improper performance and this time There was contract termination, disputes, disputes, arbitration and lawsuits among the tenderers; the company was not suspended by the relevant authorities due to issues such as fraudulent bid winning or serious breach of contract, major project quality, safety accidents, etc. The main management personnel of the project management department of the company (referred to as the project leader, project technical leader, construction worker, safety officer, and quality officer) are in line with the “Management staffing methods for Jiangsu Construction Engineering Construction Project Management Department and project supervision agency. 》(Su Jianjian Management (2014) No. 701) and the “Interpretation of Questions Concerning the Management of Construction Management Project Managers and Project Supervisory Organizations in Jiangsu Province”. A copy of the original letter of commitment is attached to the "property of litigation and arbitration in recent years" and uploaded to the bid document.)
3.1.5 The proposed project manager must have the following conditions:
3.1.5.1 [Building Building Engineer Registered Level 2] (inclusive) or above
3.1.5.2 If the bidder intends to assign the project manager to possess xx professional xx and above registered building architect qualifications or qualification of a small project manager, he must have an effective safety production evaluation certificate and register with the company for 3 months; If the bidder intends to assign the project manager with other qualifications, it must provide the labor contract signed with the applicant, proof of endowment insurance (the “Employees Pension Insurance Handbook” in the three-month payment list nearby or the three issued by the social security agency. Proof of monthly payment: In the past three months, the payment is made for three consecutive months and the payment time is in the first three months of the month when the tender announcement is issued. For example, if a project announces a tender announcement in May 2011, the project manager is required to submit Provide proof of endowment insurance payment from February to April 2011).
3.1.6 The proposed project manager must have one of the following conditions:
3.1.6.1 The proposed project manager is not under construction after the change.
3.1.6.2 The proposed project manager has no construction in progress after the change, and: the original contract period has expired and the date of change of filing has reached 6 months; or, the project has been suspended for more than 120 days due to non-contractor reasons, and The construction unit agreed and has gone through the project manager's change of formalities.
3.1.6.3 The proposed project manager has a construction in progress, but the project under construction belongs to the same project project, approval of the same project, sub-contracted or phased construction of the same construction site.
3.2 The Commonwealth does not accept bids from the Consortium. The bid of the consortium shall meet the following requirements:/
3.3 Each bidder may bid for 1 (specific quantity) bids in the above bid, but the maximum allowed bid is 1 (specific amount) bids (applicable to the tender project of the bid-sharing segment).
3.4 The qualification review of the bidder shall be conducted after the qualification examination. The criteria and contents of the main qualification review are detailed in the tender documents.
Bidder qualification requirements, only eligible qualified bidders may be awarded the contract.
4. Obtaining tender documents
4.1 Any interested bidder should purchase and download the bidding documents from 9:00 am on December 13, 2017 to 16:00 on December 18, 2017. The overdue documents will no longer be sold. The tender documents are priced at RMB 250.00 per kit ( ≤250 yuan), after sale is not refundable.
4.2 This project does not handle the mail-order of the bidding documents.
5. Submission of bid documents

LED Hotel Projector

With the advancement of technology, LED technology has been applied to projectors. There are many good domestic LED projector manufacturers in the market. For example, Shenzhen Resources has perfectly combined this technology with DLP technology to make it portable and compact. Because of its low power consumption and heat generation, it is more widely used in life and in personal business. The same goes for LED hotel projectors.

portable led projector,led home theater projector,led holiday projector,led room light projector,led 4k projectors

Shenzhen Happybate Trading Co.,LTD , https://www.happybateprojectors.com